Grid for school and section - selection
The solution is based on frequent assembly, storage and work with groups of students The card is issued as a request: PROpickleball First, it will confirm a specific model or configuration, supplier, characteristics, price, availability and term, and only after that the order can be paid for.
Price after model confirmation and delivery
On request
What is important to know about choice
In school and in the sections, the grid is put up and removed by people who do it quickly and not always carefully — often by the students themselves, so the priority is given to ease of assembly and safety of the knots
The second most important issue is storage: the structure should be placed in the existing storage room and do not require a separate room
Before confirmation, specify the size of the hall, the number of groups who are responsible for the inventory and where it is stored between classes
Characteristics and configuration
- Selection
- Site, assembly frequency, transportation, storage and budget
- Before payment
- Confirm the design, completeness, price and term
Who's good for it
The solution is designed to address the followingschools, sectionsVerify the performance with the conditions of the site, the level of players and the expected frequency of use
How to order
We will confirm availability, total cost, configuration and delivery time before payment, and for clubs, schools and events, we will additionally check the number of players, courts and required inventory